Combined Optimization Method Based on Project Risk and Resource Allocation

【摘要】:Project risk is measured based on method of evaluation by experts,creating a combined optimization model of project risk and resource allocation,and using simulated annealing algorithm to solve the model.Program of simulated annealing algorithm is compiled by VC++6.0,and initial value of search and iterative steps of resource ratio of subproject according to iterative request of program is selected.Operated program of simulated annealing algorithm and compared analysis of operation result by computer,better allocation ratio of subproject's resource is obtained while the project risk is minimized.

知网文化
【相似文献】
中国重要会议论文全文数据库 前6条
1 ;Combined Optimization Method Based on Project Risk and Resource Allocation[A];第二十七届中国控制会议论文集[C];2008年
2 ;Design and Implementation for Jerk Limited Trajectory Plan with Real-time Look-ahead Interpolator[A];第二十七届中国控制会议论文集[C];2008年
3 ;Combination Method of Support Vector Machine and Fisher Discriminant Analysis for Chemical Process Fault Diagnosis[A];第二十九届中国控制会议论文集[C];2010年
4 ;Requirements Analysis Knowledge Share and Reuse on Situation[A];第二十七届中国控制会议论文集[C];2008年
5 ;Continuous Monitoring of Landslide and Atmospheric Water Vapor Using GPS:Application in Pubugou Hydropower Resettlement Zone[A];第三届中国卫星导航学术年会电子文集——S08卫星导航模型与方法[C];2012年
6 ;Fault Diagnosis Based on Bayesian Networks for the Data Incomplete Industrial System[A];中国自动化学会控制理论专业委员会A卷[C];2011年
中国硕士学位论文全文数据库 前1条
1 肖汉;关于可靠性设施布局问题的近似算法[D];中国海洋大学;2011年
 快捷付款方式  订购知网充值卡  订购热线  帮助中心
  • 400-819-9993
  • 010-62982499
  • 010-62783978