【摘要】:A real-time mechanical fault monitoring system for gear transmission chain was studied and realized,which utiliz-ing the initial phase,the phase difference and the amount of phase modulation of the finite length modulated signal.The signal is demodulated and the phase-modulated signal is retrieved in remote control mode.Furthermore,some key techniques such as data communicating,data monitoring and anti-jamming methods are designed.
|
|
|
|
1 |
童秉枢;Expert System Realization for Conceptual Design of Mechanical Products under CIMS Environment[J];Tsinghua Science and Technology;1996年02期 |
2 |
;柔性制造系统(Flexibli Manufacturing System, FMS)[J];工业工程与管理;2000年05期 |
3 |
;泵国外文献题录[J];水泵技术;2002年04期 |
4 |
吴迪;MES效果逐步显现[J];纺织信息周刊;2005年14期 |
5 |
肖立群;Smart System物料搬运系统在高层建筑工地的应用[J];起重运输机械;2001年03期 |
6 |
李建明,许隆文;Implementation of Drawing Data Integration between CAD/CAM Systems through IGES File in CIMS[J];Tsinghua Science and Technology;1996年02期 |
7 |
庞庆华,潘郁;AJ—System生产作业调度系统的柔性设计及其实现[J];电脑开发与应用;2003年03期 |
8 |
;1986年《甘肃工业大学学报》总目录[J];兰州理工大学学报;1986年04期 |
9 |
张建民;生产系统的开放化动向[J];机电一体化;1998年04期 |
10 |
小林;1996年世界机床销售额名列前茅的15家公司[J];世界制造技术与装备市场;1998年01期 |
11 |
田永利,邹慧君,郭为忠,叶志刚;机电一体化系统建模技术与仿真软件的研究与分析[J];机械设计与研究;2003年04期 |
12 |
;商务前程(英文)[J];现代制造;2003年22期 |
13 |
;公司索引[J];现代制造;2003年07期 |
14 |
谢小海;专用冷却装置[J];铁道机车车辆工人;1996年12期 |
15 |
高春华,李人厚;柔性制造系统调度的次优方法[J];组合机床与自动化加工技术;1997年11期 |
16 |
李建平,甘茂治,张柳;国外维修与维修性发展动态[J];中国机械工程;1998年04期 |
17 |
;公司索引[J];现代制造;2003年22期 |
18 |
;河北工业大学学报2004年第33卷总目次[J];河北工业大学学报;2004年06期 |
19 |
朱云仙,何亚飞;可重构制造系统(RMS)的技术方法[J];上海海事大学学报;2004年03期 |
20 |
谢君翌,汤文成,倪中华;基于多代理机制的车间制造资源调度管理系统的研究[J];计算机集成制造系统-CIMS;2005年06期 |
|