收藏本站
《中国自动化学会控制理论专业委员会D卷》 2011年
收藏 | 手机打开
二维码
手机客户端打开本文

Material Layer Control Based on Slag Vertical Mill's Steady Conditions

【摘要】:正The slag grinding process is introduced.The basic control forms of vertical mill are presented by analyzing the dynamic characteristics of material layer in slag vertical mill.Simulation results show that,in steady conditions,self-tuned scaling factors fuzzy controller performs better than basic fuzzy controller in material layer control.Self-tuned scaling factors fuzzy controller was applied in one slag vertical mill for a month period.The effect of practical control proves that,compared with manual control,Self-tuned scaling factors fuzzy controller can reduce the fluctuation range of the material layer and the vibration of slag vertical mill,at the same time no unusual vibration shutdown occurs.

知网文化
【相似文献】
中国期刊全文数据库 前20条
1 ;《长沙矿山研究院季刊》1989年论文目录索引[J];矿业研究与开发;1990年01期
2 ;阜新矿业学院学报(自然科学版)第11卷(1992年)总目次[J];辽宁工程技术大学学报;1992年04期
3 ;1993年(第12卷)总目次[J];辽宁工程技术大学学报;1993年04期
4 ;北京矿冶研究总院学报(季刊)第2卷 总目次 1993年[J];矿冶;1993年04期
5 T.柯斯顿,T.G拉姆,阚世喆;盖斯河矿地下水的评价(二)[J];国外金属矿山;1995年05期
6 ;Tancheng-Lujiang Fault System: Its Characters and Control on Oil-Gas Distribution in Eastern China[J];中国地质大学学报(英文版);1996年02期
7 ;《阜新矿业学院学报(自然科学版)》第10卷(1991年)——总目次[J];辽宁工程技术大学学报;1991年04期
8 K·卡利纳斯基,毛益平;浮选尾煤灰分含量的自动控制[J];国外金属矿选矿;1998年09期
9 Y·奥卡诺,魏新超;选矿工程中的双线性过程及其控制[J];国外金属矿选矿;1998年09期
10 蓝叶青,周刚,刘正华,胡霭堂;废矿堆中黄铁矿氧化控制新技术——有机盐包膜法[J];环境化学;2000年05期
11 唐耀庚,胡蓉;矿浆浓度神经网络PID控制系统[J];南华大学学报(理工版);2002年02期
12 唐德茂,兰华;煤矿综合自动化系统中的网络技术[J];山西机械;2003年S1期
13 刘爱军,周知进;水下破碎机转速容错控制器的设计[J];矿山机械;2004年07期
14 谢捷敏;ACT软件在大山选矿厂的应用[J];江西有色金属;2005年01期
15 程相文,钱淑丽,王世平;CST在长距离带式输送机中的应用[J];矿山机械;2005年05期
16 ;[J];;年期
17 ;[J];;年期
18 ;[J];;年期
19 ;[J];;年期
20 ;[J];;年期
中国重要会议论文全文数据库 前10条
1 ;Material Layer Control Based on Slag Vertical Mill's Steady Conditions[A];中国自动化学会控制理论专业委员会D卷[C];2011年
2 ;Integrated Modeling and Intelligent Control Methods of Grinding Process[A];Proceedings of the 2011 Chinese Control and Decision Conference(CCDC)[C];2011年
3 ;Feasibility Analysis of Waste Phosphate Rock Treatment for Pollution Control of Coal Waste Piles with Spontaneous Combustion by Inhibiting Pyrite Oxidation[A];Proceedings of Symposium from Cross-strait Environment & Resources and 2nd Representative Conference of Chinese Environmental Resources & Ecological Conservation Society[C];2010年
4 ;Study of Downward Communication Receiver in Rotary Steerable Drilling Tool Based on Turbine Generator[A];第二十九届中国控制会议论文集[C];2010年
5 ;Study on Key Technologies of Coal Mine Main Fan Automatic Switchover with Ventilation Unceasing[A];Proceedings of 2010 Chinese Control and Decision Conference[C];2010年
6 Nǘez Felipe;Cipriano Aldo;;Hybrid Modeling of Froth Flotation Superficial Appearance Applying Dynamic Textures Analysis[A];第二十七届中国控制会议论文集[C];2008年
7 ;3-D Tomographic Images and Deep Ore-Control in Northern Margin of the North China Plate[A];中国科学院地质与地球物理研究所2002学术论文摘要汇编[C];2002年
8 ;Simulation Modeling for Heave Compensation of Heavy-duty Semi-active Heave Compensation System[A];第二十九届中国控制会议论文集[C];2010年
9 ;Predictive Control Based on Multi-network for a Deep Seabed Mining Robot Vehicle[A];中国自动化学会控制理论专业委员会A卷[C];2011年
10 ;Analysis of Ground Fissures Induced by Underground Mining in a Metal Mine[A];中国科学院地质与地球物理研究所第11届(2011年度)学术年会论文集(中)[C];2012年
中国硕士学位论文全文数据库 前1条
1 路平;西山集团内部控制体系的构建研究[D];山西大学;2012年
中国知网广告投放
 快捷付款方式  订购知网充值卡  订购热线  帮助中心
  • 400-819-9993
  • 010-62982499
  • 010-62783978