Reactivation of an overlooked landslide in site of power plant of Shawan hydropower station,Sichuan,China

S.W.Qi  F.Wu  Y.Song  Z.Q.Li  
【摘要】:正The power plant of planning construction Shawan hydropower station was planned in the toe area of the right bank slope.Large scale cracks with maximum length over 20 m and downward displacement over 1.0 m occurred in the Quaternary accumulation of the middle part of the slope during excavating site for the power plant,and as a result the excavation has to be stopped.A monitor net was placed on the slope and the monitor result indicated that a slide mass has been formed.Combing with topography analysis,geological investigation i.e.,borehole exploration,geophysical investigation,it can be concluded that the slope where the power plant located is an overlooked giant ancient landslide during pre-stage investigation for site of hydropower plant,and the landslide is partially reactivated.Monitor results indicated that the deformation of the slide is not even,the displacement of the head area is mainly vertical component,and the displacement of the toe area is mainly horizontal component.The slide was induced by lots of drainage from No.2 access tunnel,the successive rainfall would accelerate the deformation, and the excavation of new provincial highway in toe area had a crucial effect on local deformation. The slide mass had experienced rainstorm seasons and it did not present severe deformation,thus the slide mass could be stable if drainage system including surface and underground is adopted.The risk of blocking up Muli River is low.The conclusions presented above have been verified in practice.

知网文化
【相似文献】
中国期刊全文数据库 前20条
1 楼楠;汤廷松;范百兴;陈继华;;超站仪的特点分析及功能测试[J];测绘技术装备;2006年03期
2 ;[J];;年期
3 ;[J];;年期
4 ;[J];;年期
5 ;[J];;年期
6 ;[J];;年期
7 ;[J];;年期
8 ;[J];;年期
9 ;[J];;年期
10 ;[J];;年期
11 ;[J];;年期
12 ;[J];;年期
13 ;[J];;年期
14 ;[J];;年期
15 ;[J];;年期
16 ;[J];;年期
17 ;[J];;年期
18 ;[J];;年期
19 ;[J];;年期
20 ;[J];;年期
中国重要会议论文全文数据库 前10条
1 ;A nonlinear dynamical model of landslide evolution[A];中国科学院地质与地球物理研究所2002学术论文摘要汇编[C];2002年
2 ;Baota landslide in the Three Gorges area and its OSL dating[A];中国科学院地质与地球物理研究所2008学术论文汇编[C];2009年
3 Souting Lee;;On evaluating the stability of the Baiyian ancient landslide in the Three Gorges Reservoir area,Yangtze River:a geological history analysis[A];中国科学院地质与地球物理研究所2008学术论文汇编[C];2009年
4 ;A super-large landslide in Tibet in 2000:background,occurrence,disaster,and origin[A];中国科学院地质与地球物理研究所二○○三学术论文汇编·第三卷(地球环境·工程地质与灾害)[C];2003年
5 ;Study of the Critical Displacement of Landslides by Renormalization-Group Theory[A];中国科学院地质与地球物理研究所第11届(2011年度)学术年会论文集(中)[C];2012年
6 ;Characteristics,mechanism and development tendency of deformation of Maoping landslide after commission of Geheyan reservoir on the Qingjiang River,Hubei Province,China[A];中国科学院地质与地球物理研究所2006年论文摘要集[C];2007年
7 ;Addressing severe slope failure hazards along Sichuan-Tibet Highway in Southwestern China[A];中国科学院地质与地球物理研究所二○○三学术论文汇编·第三卷(地球环境·工程地质与灾害)[C];2003年
8 Chu Van Ngoi;Ta Trong Thang;Luong Thi Thu Hoai;;山体滑坡对可持续性发展的影响(英文)[A];北京论坛(2008)文明的和谐与共同繁荣——文明的普遍价值和发展趋向:“生态文明:环境、能源与社会进步”环境分论坛论文或摘要集[C];2008年
9 ;Continuous Monitoring of Landslide and Atmospheric Water Vapor Using GPS:Application in Pubugou Hydropower Resettlement Zone[A];第三届中国卫星导航学术年会电子文集——S08卫星导航模型与方法[C];2012年
10 ;Pn-wave velocity and anisotropy of the western Sichuan and Longmen Mountain region,China[A];中国科学院地质与地球物理研究所第十届(2010年度)学术年会论文集(中)[C];2011年
中国博士学位论文全文数据库 前10条
1 张斌;滑坡地质灾害远程监测关键问题研究[D];中国矿业大学(北京);2010年
2 Aref Mohammed Othman Al-Jabali(阿里夫);辽宁本溪工源水泥5000t/d熟料生产线边坡地质环境工程研究及稳定性评价[D];吉林大学;2010年
3 杜娟;单体滑坡灾害风险评价研究[D];中国地质大学;2012年
4 朱志刚;北京双大路碎裂岩质滑坡灾变机理及控制技术[D];中国地质大学(北京);2012年
5 王日勖;抚顺西露天矿北帮滑坡监测预报系统研究[D];吉林大学;2011年
6 李远耀;三峡库区渐进式库岸滑坡的预测预报研究[D];中国地质大学;2010年
7 李德营;三峡库区具台阶状位移特征的滑坡预测预报研究[D];中国地质大学;2010年
8 雷光宇;三峡库区涉水土质滑坡稳定性分析及处治技术研究[D];中国矿业大学;2009年
9 罗刚;唐家山高速短程滑坡堵江及溃坝机制研究[D];西南交通大学;2012年
10 杨庆华;强扰作用下砂堆模型及崩塌滑坡动力学特性研究[D];西南交通大学;2010年
中国硕士学位论文全文数据库 前10条
1 格桑;拉贡公路k18段大滑坡安全性能研究[D];重庆交通大学;2010年
2 王东;基于监测数据的凉水井滑坡数值模拟与预测预报[D];重庆交通大学;2011年
3 杨建军;古交市风峁顶挤推—反弹—挤推式滑坡形成机理及稳定性研究[D];太原理工大学;2010年
4 王振强;重大滑坡阶段演绎稳定性分析与综合安全度[D];重庆交通大学;2010年
5 张龙;鸡尾山高速远程滑坡运动过程模拟研究[D];中国地质大学;2012年
6 王宇;滑坡渐进破坏模糊随机可靠性研究[D];中国地质大学;2012年
7 曾凡雷;滑坡地质灾害变形预测及同步性预警机制研究[D];河北工程大学;2012年
8 张翔;甘肃舟曲锁儿头滑坡变形破坏机制及稳定性研究[D];成都理工大学;2012年
9 任际周;基于次声波技术的滑坡监测预警系统研究[D];成都理工大学;2012年
10 刘光鹏;GIS与RS在重庆市滑坡风险区划中的应用研究[D];西南大学;2010年
中国重要报纸全文数据库 前4条
1 中国中铁建工集团有限公司;中铁建工集团:高铁匠人[N];人民铁道;2010年
2 陈耀强 傅琴 驻站记者肖双剑;新战士成了士官班长的“老师”[N];战士报;2011年
3 本报记者 刘妍 赵俊晖;古木夕羊 英伦之旅[N];中国服饰报;2011年
4 杨宏辉;韩泰全面发力中国替换胎市场[N];中国化工报;2011年
中国知网广告投放
 快捷付款方式  订购知网充值卡  订购热线  帮助中心
  • 400-819-9993
  • 010-62982499
  • 010-62783978